Common issues

Tasks do not appear​

Check that each task row has a valid start and end date. Also check that a field is placed in the Row Anchor well — any measure that always has a value works, such as a simple count. The visual uses it to know a row exists, so rows without it are not drawn.

Hierarchy looks wrong​

Confirm that WBS levels and WBS code are consistent. If some rows skip a level (for example, a task has a Level 1 and a Level 3 value but no Level 2) or leave a level blank, tasks can group under the wrong parent and roll-ups can show unexpected totals.

Progress looks unexpected​

Verify whether the source column uses decimals (0.49) or percentages (49). Do not mix both formats in the same field.

Timeline is too compressed​

Reduce task-list column widths, change the default time view, or increase the visual width in the Power BI report canvas.

Visual is slow​

Large project schedules can affect refresh performance. Start by testing filtered datasets, then increase row count while checking refresh time in Power BI Desktop and Power BI Service.